Residential case study · Duro-Last® roofing
Residential Duro-Last Roof Recover
About 120 years old, this home had accumulated several additions, with poorly detailed roof transitions that were causing serious leaks. Garrett Construction installed a foam substrate and a Duro-Last® overlay across the affected areas, covering the old transitions with one continuous roofing system with welded seams. The work resolved those leaks. We also replaced and improved the metal flashing where the roof meets the gable wall.
Before and after.
Roof transitions
Adjoining roof sections
Roof-to-wall flashing
- Our role
- Roof recover and roof-to-wall flashing








